Return to industry solutions

Logistics · Transportation

Logistics and transportation solutions

Air transportation capabilities for the last mile and emergency scenarios, supporting cargo hold, rappel and mooring expansion.

logistics
Logistics and transportation
  • 40 KG

    Class load

  • redundancy

    security architecture

  • emergency

    Quick response

Industry pain points

Interrupted road conditions · Tight deadlines · Diverse loads

Material transportation in disasters, isolated islands and remote work areas is often delayed due to road interruptions, making it difficult for traditional transportation to meet timeliness requirements.

Cargo types vary widely, from medical supplies to industrial spare parts, requiring flexible cargo holds and reliable redundant flight control.

Solution ideas

Extra large payload + redundant flight

The DX-H6HL carries large cargo holds and heavy materials, and the DX-X8 coaxial redundant design ensures the safety of high-risk transportation tasks.

It supports rope-drop release, fixed-point landing and tethering expansion, adapting to different landing environments and regulatory requirements.

Recommended platform

A platform suitable for this scenario

Extra large load

DX-H6HL super large load platform

With a wingspan of 3.2 meters and 300+ pounds of available thrust, it is designed for extremely large payloads and the most demanding professional equipment.

  • 40 KG · Maximum load
  • 48 MIN · Battery life
  • 3.2 M · span
了解 DX-H6HL
redundancy level

DX-X8 eight-rotor

Coaxial motor redundancy, foldable frame, stable hovering and professional payload integration meet industrial, scientific research and special high-risk deployments.

  • 8 KG · Maximum load
  • 43 MIN · Battery life
  • X8 · coaxial redundancy
了解 DX-X8

Typical load

Common integration configurations

Modular cargo bay

Temperature control, shock absorption and quick loading and unloading design, suitable for a variety of materials.

rope drop delivery system

Precise material delivery in areas where landing is impossible.

Tethered power supply module

Persistent hover watch and communication relay extension.

Work process

From planning to delivery

01

route assessment

Take-off and landing site selection, airspace and meteorological conditions analysis.

02

Payload integration

Cargo hold fixing, center of gravity calibration and safety inspection.

03

flight execution

Autonomous or semi-autonomous flight, with ground station monitoring throughout.

04

Sign for confirmation

Image recording, coordinate archiving and task review.

Build your air transportation capabilities

Describe the transport distance, load weight and scenario constraints and we will evaluate possible options.